Fluor in Romania

Advancing a clean and secure energyfuture.

Fluor is supporting Romania’s energy ambitions through its role in the Cernavodă Nuclear Power Plant Units 3 and 4 project and the proposed Doicești small modular reactor facility, drawing on more than 80 years of nuclear and complex-project experience.

Years of nuclear experience
80+
Cernavodă Units 3 & 4
~1.400MWe
Doicești SMR, up to six modules
462MWe
Bucharest office opened
2026

01 — Fluor in Romania

A long-term partner for Romania’s energy future.

Romania is advancing major investments in nuclear energy to strengthen energy security, expand the supply of reliable low-carbon electricity and support long-term economic development. Fluor is contributing global nuclear, engineering and project-delivery experience to two initiatives at the center of that effort: Cernavodă Units 3 and 4 and the proposed Doicești SMR facility.

Fluor’s Bucharest office provides a local base for collaboration with clients, project partners, government stakeholders, Romanian industry and the country’s skilled workforce. Opened in March 2026, the office expands Fluor’s European presence and supports the company’s work on conventional and next-generation nuclear projects in Romania.

  • Bucharest

    • Fluor office
    • Opened March 2026
  • Cernavodă

    • NPP Units 3 & 4
    • ~1,400 MWe
    • EPCM via the FCSA joint venture
  • Doicești

    • Small modular reactor
    • Up to 462 MWe
    • Phase 2 FEED
  • Office
  • Project site

Select a location to see details

Aerial view of Bucharest at golden hour, with a wide boulevard running between residential and office buildings
Bucharest — Fluor’s base in Romania

02 — Projects in Romania

Two projects at the heart of Romania’s nuclear future.

Cernavodă Nuclear Power Plant on the Danube–Black Sea Canal

Cernavodă Units 3 & 4

~1,400MWe

Limited Notice to Proceed phase

Cernavodă Nuclear Power Plant Units 3 and 4

Romania plans to complete two additional CANDU 6 reactors at the existing Cernavodă Nuclear Power Plant, adding approximately 1,400 MWe of combined generating capacity. Fluor is part of the FCSA joint venture engaged by EnergoNuclear under an Engineering, Procurement and Construction Management agreement.

Reactors
2 × CANDU 6
Capacity
~1,400 MWe combined
Client
EnergoNuclear
Fluor’s role
EPCM, as part of the FCSA joint venture
Two new reactor units at Cernavodă
Unit 3
Unit 4
Cooling towers releasing steam beside a lake under a cloudy sky, illustrating a former coal-fired power site

Doicești SMR

up to 462MWe

Phase 2 FEED

Doicești Small Modular Reactor Project

At Doicești, RoPower Nuclear is developing a proposed small modular reactor facility on the site of a former coal-fired power plant. Fluor is providing Phase 2 front-end engineering and design services — a potential model for pairing emerging nuclear technology with existing energy infrastructure.

Technology
NuScale SMR
Configuration
6 modules
Capacity
up to 462 MWe
Developer
RoPower Nuclear
Fluor’s role
Phase 2 FEED
Six NuScale power modules at Doicești
  1. Module 01
  2. Module 02
  3. Module 03
  4. Module 04
  5. Module 05
  6. Module 06

6 modules · up to 462 MWe

Opening an office in Bucharest reinforces Fluor’s long-term commitment to supporting Romania as it expands access to clean, reliable nuclear power.

Pierre Bechelany — Business Group President, Energy Solutions, Fluor

03 — Fluor Nuclear

Trusted through time. Nuclear experience since 1946.

Fluor’s involvement in the nuclear sector dates to 1946. Over the decades, the company has supported commercial and government programs involving nuclear-facility design and construction, plant operations and maintenance, modernization, licensing, environmental remediation, national security and the nuclear fuel cycle. Fluor applies rigorous quality systems, specialized nuclear accreditations and a safety-led execution culture to complex projects around the world.

An operator working at the control panels of a nuclear plant control room
years of nuclear experience
80+
work hours of construction & field work since 2014
50M
ASME N-Stamp accreditations maintained
4
commercial reactor plants designed and built
3
nuclear reactor plants constructed
8
additional units supported
14

Fluor nuclear timeline

  1. 1946Relationship with the U.S. Atomic Energy Commission formalized
  2. 1970s–80sSupported the design and construction of 22 commercial nuclear plants
  3. 2008Fluor-led team begins managing the Savannah River Site
  4. TodayAP1000 deployment and next-generation SMR projects
  5. 2026Bucharest office opens; work on Cernavodă 3 & 4 and Doicești SMRBucharest
Fluor team members on an industrial site wearing hard hats, safety glasses and high-visibility vests

Safety as a culture

Safety is one of our core values.

We have built our industry-leading health, safety and environmental reputation on knowledge obtained over decades of building some of the world’s largest, most complex and innovative projects.

  • Safety
  • Integrity
  • Teamwork
  • Excellence
A welder in a protective helmet joining steel, with sparks flying

05 — Romanian industry

Building with Romanian industry.

Fluor recognizes the important role that qualified Romanian companies, institutions and skilled professionals can play in the successful delivery of complex energy projects. As project planning and contracting advance, Fluor will continue engaging with Romanian industry in line with project requirements, approved procurement strategies and applicable qualification processes.

Four engineers in white hard hats reviewing drawings together on a construction site

06 — Careers

Shape Romania’s energy future with us.

Fluor’s growing presence in Romania offers an opportunity to connect experienced professionals and emerging talent with complex projects that support the country’s energy future.

Search careers

07 — News

News and press

View all news

08 — Contact

The nuclear industry’s next chapter is being written now. Fluor has been part of every chapter before it.

We are ready to partner with Romania.